Skip to content
RAILWAY ARCHAEOLOGY IPSWICH (QLD)
Alister J Cameron
Home
Locations
Maps
Main Map Combo
Map Ipswich Region 1860s-80s
Map Ipswich Region 1910s-1930s B
Map Ipswich Region 1960s-1970s
Contact Me
Page List
Menu
Home
Locations
Maps
Main Map Combo
Map Ipswich Region 1860s-80s
Map Ipswich Region 1910s-1930s B
Map Ipswich Region 1960s-1970s
Contact Me
Page List
31C5(C) The Ipswich Railway Workshops; What Remains Today
AERIAL PHOTO IPSWICH WORKSHOPS 2011 North Ipswich Railyards Vision Plan 5 July 2011
IPSWICH RAILWAY WORKSHOPS VIEWED FROM THE SOUTH-EAST 2018 Foreground is the site of the former Roundhouse. Photo: Alister J Cameron
SOUTH GATE OF IPSWICH RAILWAY WORKSHOPS 2012 Yard originally extended further south as can be seen by the truncated siding. This has since been removed. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS SOUTH GATE 2018 There are two external sidings; one of which leads to the Workshops Station. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS SOUTH YARD 2018 Smoke in distance is Heritage Loco preparing for a journey. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS SOUTH YARD 2012 Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS SOUTH YARD 2012 Note truncated siding from former larger yard. In foreground from left to front: Wagon Repair Shop, Spray Painting Shop & Lighting Up Shed. In background; Wagon & Carriage Shop on left; Machine & Erecting Shop on right. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS SOUTH YARD 2018 Wagon Repair Shop on left. Spray Paint Shop on right.
IPSWICH RAILWAY WORKSHOPS SOUTH YARD Wagon Repair Shop on left. Spray Paint Shop on right. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS SOUTH YARD FROM A DIFFERENT ANGLE 2012 Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS SOUTH YARD 2018 Staff lunch room facilities are on the left with toilet block in front. Wagon and Carriage Shop is on right. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS SOUTH YARD FACING SOUTH-WEST 2018 Viewed from the rear of the Erecting Shop. Spray Painting Shop on left; staff facilities on right. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS FACING SOUTH 2011 Viewed from rear of Boiler Shop. Photo: Alister J Cameron
WORKSHOPS EXTERNAL SIDINGS EAST OF SOUTH YARD 2018 Area top left is site of former Roundhouse. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS EXTERNAL SIDINGS FACING NORTH 2015 Sheet Metal Shop is on the left and the Boiler Shop is to the right of it. In the distance is the Workshops Station platform. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOP EAST ENTRANCE (SOUTH) 2018 Sheet Metal Shop is on the right; Boiler Shop is on the right. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS FROM EAST ENTRANCE (SOUTH) 2018 Sheet Metal Shop is on left; Ammenities Building in middle; and Boiler Shop is on right. Photo: Alister J Cameron
IPSWICH RAILWAY WORKSHOPS TRAVERSER AREA FROM NEAR POWER HOUSE 2011 From left to right: Former Boiler Shop; Machine Shop and Foundry. Photo Alister J Cameron
TRAVERSER AREA SOUTHERN SIDE 2016 From left to right, former: Wagon Shop, Carriage Shop & Paint Shop. Photo: Alister J Cameron
TRAVERSER MACHINERY 2011 Photo: Alister J Cameron
FORMER BOILER SHOP 2018 Large blue generator in front was required because of a major power outage. Photo: Alister J Cameron
TRAVERSER AREA SOUTHERN SIDE 2018 In order from left to right: former Boiler Shop, Machine Shop, Erecting Shop, Wagon Shop, Carriage Shop and Paint Shop. Photo: Alister J Cameron
TRAVERSER AREA SOUTHERN SIDE 2011 From left to right former: Boiler Shop; Machine Shop; Erecting Shop. Photo: Alister J Cameron
TRAVERSER AREA SOUTHERN SIDE 2016 From left to right, former: Wagon Shop, Carriage Shop & Paint Shop. Photo: Alister J Cameron
FORMER FOUNDRY 2018 Photo: Alister J Cameron
FORMER FOUNDRY 2018 Note 'Tours' sign far right. Currently these are not happening. Photo: Alister J Cameron
BLACKSMITH SHOP 2011 Photo: Alister J Cameron
TRAVERSER AREA NORTH SIDE 2011 In order from left to right: Refrigeration Store, Trimmers & Electroplaters Shop, Southern Sawmill, Wheel Shop & Supply Warehouse (far right) Photo: Alister J Cameron
TRAVERSER AREA NORTHERN SIDE 2016 Supply Warehouse-Stores on right. Photo: Alister J Cameron
FORMER TIME KEEPER-TIME KEEPER OFFICE, NOW ENTRANCE TO WORKSHOPS MUSEUM 2012 Photo: Alister J Cameron
FRONT WORKSHOPS COURTYARD 2018. Photo taken from verandah of Time Keeper's office. War Memorial is on left with Dining Room behind. In background is glimpse of Tool Shop. Photo: Alister J Cameron
BIKE RACKS UNDERNEATH DINING ROOM 2018. Each rack dedicated to particular shops as shown. Photo: Alister J Cameron
WORKSHOPS FROM THE FRONT (NORTH ST) 2018 Proceeding up the hill from left to right are Dining Room, 3 connecting buildings making up the Tool & Guage Shop, Laboratory, and site of former Institute Building. Photo: Alister J Cameron
TOOL & GUAGE SHOP & LABORATORY BUILDING FROM EAST 2012 Photo: Alister J Cameron
LOOKING DOWNHILL THIS TIME FROM EAST 2012 Left to right: Time-Keepers Office, Tool & Guage Shop,& Laboratory Photo: Alister J Cameron
RAILWAY INSTITUTE BUILDING 2011 Photo: Alister J Cameron
LABORATORY BUILDING FROM REAR 2018 Institute Building & Main Offices are now removed. Photo: Alister J Cameron
THE TWO WATER TOWERS & DRAWING OFFICE 2011 The timber water tower has since been removed, and Drawing Office was destroyed by fire. Photo: Alister J Cameron
DRAWING OFFICE WITH MAIN OFFICES BEHIND 2011 Photo: Alister J Cameron
DRAWING OFFICE AFTER BEING DESTROYED BY FIRE 2011 Photo: Alister J Cameron
ADMINISTRATIVE OFFICES BEFORE DEMOLITION 2011 Photo: Alister J Cameron
WORKSHOPS POWER HOUSE 2018 Photo taken facing north. Foundry Shop is on left and path to vacant site of Administrative Buildings is on right. The areas of grass are the site of the Apprentice School Photo: Alister J Cameron
CLOSUP OF THE FRONT OF THE WORKSHOPS POWER HOUSE 2018 On the left is the Generator Hall, and on the right, the Boiler House. Photo: Alister J Cameron.
INSIDE BOILER HOUSE 2011 Boilers have long gone. Note metal doors at base of right-hand wall where coal was delivered from raised siding on other side. North Ipswich Railyards Vision Plan 2011
INSIDE THE BOILER HOUSE 2018 At the moment used for storage. Photo: Alister J Cameron
RAISED COAL SIDING ON SIDE OF BOILER HOUSE 2018 Photo: Alister J Cameron
REAR OF POWERHOUSE 2012 Photo: Alister J Cameron
REAR OF POWERHOUSE 2018 Cutting which formerly conveyed coal siding can be clearly seen. Photo: Alister J Cameron
IPSWICH WORKSHOPS NORTH YARD LOOKING EAST 2018 Top layer of contaminated soil has been removed in preparation for further development. Substation is on left, water tower in middle and Powerhouse on right. Photo: Alister J Cameron
IPSWICH WORKSHOPS NORTH YARD LOOKING SOUTH-WEST 2018 Some buildings have been truncated and northern fence moved further south to allow for redevelopment of area in front. Photo: Alister J Cameron
IPSWICH NORTH YARD LOOKING WEST (FROM NEAR POWERHOUSE 2018 Original northern fence can just be seen on far right. Photo: Alister J Cameron
IPSWICH WORKSHOPS NORTHERN EDGE 2018 Pattern Shop is on left with Foundry behind. On right is rear of Blacksmith Shop. Photo: Alister J Cameron
IPSWICH WORKSHOPS NORTHERN EDGE 2018 Shows Forge with Blacksmith Shop at the rear. Photo: Alister J Cameron
IIPSWICH WORKSHOPS NORTHERN EDGE 2018 From left to right: Forge,very truncated Stores Building, Wheel Shop & Substation Building. Photo: Alister J Cameron
IPSWICH WORKSHOPS NORTHERN EDGE 2022 Southern Sawmill Building is on left, Trimmers Shop on right. By this time the majority of the sawmill infrastructure has been removed. Photo: Alister J Cameron
IPSWICH WORKSHOPS VIEWED FROM THE WEST 2011 Note the extensive earth works on the bank below. Bremer River is at the bottkom. Area has been left fallow since. Paint Shop is clearly visible. Photo: Alister J Cameron
IPSWICH WORKSHOPS FROM THE WEST 2011 Traverser is on the right; Brick Trimmers Shop is in centre; and various timber sheds are at left. Photo: Alister J Cameron
IPSWICH WORKSHOPS FROM THE NORTH-WEST 2013 Entrance to Mihi Creek is on left. Top left is Sawmill Building; top right is Paint Shop. Photo: Alister J Cameron
IPSWICH WORKSHOPS VIEWED FROM THE WEST 2011 Note the extensive earth works on the bank below. Bremer River is at the bottkom. Area has been left fallow since. Paint Shop is clearly visible. Photo: Alister J Cameron
IPSWICH WORKSHOPS FROM THE WEST 2011 Traverser is on the right; Brick Trimmers Shop is in centre; and various timber sheds are at left. Photo: Alister J Cameron
IPSWICH WORKSHOPS FROM SOUTH-WEST 2014 Landscaped area now covered with grass & weeds Photo: Alister J Cameron
IPSWICH WORKSHOPS FROM THE NORTH-WEST 2013 Entrance to Mihi Creek is on left. Top left is Sawmill Building; top right is Paint Shop. Photo: Alister J Cameron
CLOSEUP OF WESTERN SIDE OF PAINT SHOP 2014 Note siding on near side that connects South with North Yard Image: Alister J Cameron
ANOTHER VIEW OF PAINT SHOP FROM THE WEST 2014 Photo: Alister J Cameron
IPSWICH WORKSHOPS FROM WEST 2014 Two brick buildings from left to right; South Sawmill Buildings; Timmers Shop with Amenities Block attached; Various structures of Polution Plant & Paint Shop. Photo: Alister J Cameron
IPSWICH WORKSHOPS WESTERN SIDE, LOOKING TOWARDS THE NORTH 2014 On left: Sawmill Building and Timber Gantry. Photo: Alister J Cameron
SEALED PUMP ON BANK OF BREMER WEST OF WORKSHOPS 2013 Photo: Alister J Cameron
CLOSEUP OF THE SEALED PUMP 2013 Wheels at top facilitated movement of sliding metal door; probably removed for safety reasons. Photo: Alister J Cameron
REAR SLIDING DOOR OF SEALED PUMP; SLIDING DOOR IN SITU 2018 Photo: Alister J Cameron
REAR BASE OF SEALED PUMP 2018 Large protruding pipe accessed the river Photo: Alister J Cameron
INSIDE CULVED ROOF OF SEALED PUMP. Photo: Alister J Cameron
TRAMWAY FROM WORKSHOPS LEADING DOWN BANK TO SEALED PUMP 1965 Photo provided via Ken Smith
TWO RAILS STICKING OUT FROM UNDER VEGETATION ABOVE SEALED PUMP 2018 Around 1015mm apart. Photo: Alister J Cameron
TRAMWAY IN SHALLOW CUTTING POSSIBLY RUNNING PARALELL TO BREMER RIVER NORTH 1965 Raised area in distance is possibly Woodend on the other side of the river. Photo provided via Ken Smith
TURNTABLE ON RIVER BANK NORTH OF SEALED PUMP 1965 Photo provided via Ken LJ Smith
TURNTABLE AREA NORTH OF SEALED PUMP 2018 One rail is clearly visible. Another is hidden by grass. Photo: Alister J Cameron
RAILS HEADING DOWN BANK FROM WORKSHOPS; ENDING NEAR SEALED PUMP 2014 Photo: Alister J Cameron
CLOSEUP OF RAILS 2014 Rails approximately 83cm apart. Seems of more recent origin. Possibly conveying electrical line down to river. Photo: Alister J Cameron
BRICK ARTEFACTS FROM
IPSWICH NORTH YARD & WORKSHOPS